Luxury lodge tent
Add to RFQ
Family suite tent
Geodesic dome tent
Add to RFQ
Add to RFQ
Membrane & insulation options;HVAC/solar interfaces.
Technical & Install
Membrane & insulation options;HVAC/solar interfaces.
Membrane & insulation options;HVAC/solar interfaces.
HVAC & Solar
Tent Types & Modules
Membrane & U-values
Frames & Anchors
Install & Logistics
Aluminum/steel frames;screw piles/ballast;site prep minimal.
Package AC;mini-split;PV interfaces;cable routing.
Prefab modules;crew 4-6;
rapid deploy;relocation ready.
Compare products · Short table
Key
Retractable Sunroom
Glass/PC Dome
Luxury Tent Hotel
Freestanding (two-side columns)
Install
Sealing
Wind/Snow
BMS/Fire;HVAC;sensors
Gable · single-direction
3-10 days;modular

3-7 days;minimal prep
Crabe plan & anchorage by substrate.
Rooftop F&B,pools,atriums,parking
Typhoon 12-17;Snow 30-200 kg/m²
Region/certified;options up to 12-17/100-200
Add to RFQ
EPDM labyrinth +five-path drainage
Spec details
Typhoon 12-17;Snow 30-200 kg/m²
Gable · single-direction
Gable · single-direction


Crabe plan & anchorage by substrate.
Crabe plan & anchorage by substrate.
Add to RFQ
Spec details
Add to RFQ
Spec details
Use-cases
3-10 days;prefab≈50%;zero welding
EPDM labyrinth;drip-proof
EPDM details;event seals
Single/gable/arched;attached or free-standing
Integration
Look
Stargazing venues,weddings,eco-camps
Lighting/audio;HVAC;BMS/Fire
Geodesic or segmented glass/PC
Weddings,VIP lounges,resort pop-ups
HVAC;power/data;projection/DMX
Tent shells with glass/PC fronts

Model

Crabe plan & anchorage by substrate.
Crabe plan & anchorage by substrate.
Layouts & sizing
Custom footprints welcome;final per site plan & code.
Add to RFQ
Typical area
Spec details
Best for
Add to RFQ
Spec details
Freestanding (two-side columns)
Suite Tent
Family Tent
Villa Tent
20–35 m²
Gable · single-direction
Couples, VIP pods

Crabe plan & anchorage by substrate.
35–55 m²
Families with partition
Add to RFQ
55–90+ m²
Spec details
Premium suites with lounge & deck
Gable · single-direction
Gable · single-direction


Crabe plan & anchorage by substrate.
Crabe plan & anchorage by substrate.
Add to RFQ
Spec details
Add to RFQ
Spec details
Single-slopr · single-direction
Single-slopr · single-direction


Crabe plan & anchorage by substrate.
Crabe plan & anchorage by substrate.
Add to RFQ
Spec details
Add to RFQ
Spec details
Freestanding (two-side columns)
Gable · single-direction

Crabe plan & anchorage by substrate.
Add to RFQ
Spec details
Gable · single-direction
Gable · single-direction


Crabe plan & anchorage by substrate.
Crabe plan & anchorage by substrate.
Add to RFQ
Spec details
Add to RFQ
Spec details
Envelope & structure
Frame
·Aluminum/steel per site loads
·Anchorage & base details per soil & wind region
Membrane & panels
MEP readiness
·High-performance membrane (UV/FR)
·Optional glass/PC viewing panels
·HVAC cutouts & conduits; lighting/audio integration
·Bathroom module & plumbing options
Single-slopr · single-direction
Single-slopr · single-direction


Crabe plan & anchorage by substrate.
Crabe plan & anchorage by substrate.
Add to RFQ
Spec details
Add to RFQ
Spec details
Freestanding (two-side columns)
Gable · single-direction

Crabe plan & anchorage by substrate.
Add to RFQ
Spec details
Gable · single-direction
Gable · single-direction


Crabe plan & anchorage by substrate.
Crabe plan & anchorage by substrate.
Add to RFQ
Spec details
Add to RFQ
Spec details
Acoustics & thermal (indicative)
Acoustics
Thermal
·Sound attenuation range (indicative): 18–28 dB
·Add inner liner to improve comfort
·lnsulation R-value (indicative): R 1.5–3.0
·Shading/HVAC sizing per site climate
Final performance by local calc & equipment selection.
Warranty
Lead time
Install
·Sample 5–10 days; Mass 20–30 days
· Prefab≈50%,3–10 days on site;
minimal site prep
Commercial & deployment
Incoterms
·FOB / CIF / EXW
Payment
· T/T
Freestanding (two-side columns)
Gable · single-direction

Crabe plan & anchorage by substrate.
Add to RFQ
Spec details
Gable · single-direction
Gable · single-direction


Crabe plan & anchorage by substrate.
Crabe plan & anchorage by substrate.
Add to RFQ
Spec details
Add to RFQ
Spec details
· System 2 yrs;Aluminum 30 yrs;Motor 1 yr
Branding
RAL colors,logo plates,lighting scenes
ROI signals
Resorts & eco-camps
Events & weddings
Off-grid friendly;quick renenue activation.
Fast setup;iconic look for social media.
Use cases & ROI
Freestanding (two-side columns)
Gable · single-direction

Crabe plan & anchorage by substrate.
Add to RFQ
Spec details
Gable · single-direction
Gable · single-direction


Crabe plan & anchorage by substrate.
Crabe plan & anchorage by substrate.
Add to RFQ
Spec details
Add to RFQ
Spec details
+4h/day operation;1-6(-12)months ROI(case-dependent).
FAQ
Single-slopr · single-direction
Single-slopr · single-direction


Crabe plan & anchorage by substrate.
Crabe plan & anchorage by substrate.
Add to RFQ
Spec details
Add to RFQ
Spec details
Freestanding (two-side columns)
Gable · single-direction

Crabe plan & anchorage by substrate.
Add to RFQ
Spec details
Gable · single-direction
Gable · single-direction


Crabe plan & anchorage by substrate.
Crabe plan & anchorage by substrate.
Add to RFQ
Spec details
Add to RFQ
Spec details
View detailed FAQ·
Approvals & Documents
Temporary structure permits; fire rating notes;BOM & O&M packs.
Compliance & FAQ
Open Downloads · →